Edwards Signaling PIP-015 – Install

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #5106
    Hannah Turner
    Participant

    I’m planning to install a Vesda PIP-015 in my facility using a 10 mm OD tube. Can anyone provide guidance on the installation process?

    • This topic was modified 2 years, 1 month ago by Dylan Madden.
    • This topic was modified 2 years, 1 month ago by Dylan Madden.
    #5107
    Dylan Madden
    Keymaster

    Sure! Installing the Vesda PIP-015 Flush Sample Point Head with a 10 mm OD tube is pretty straightforward. First, ensure that you have the necessary tools and materials including the appropriate drill bit for creating the hole in the wall or ceiling. Then, carefully drill a hole according to the specifications provided in the installation manual. Next, insert the head of the sample point into the hole and secure it tightly. Finally, connect the 10 mm OD tube to the head, making sure it’s properly sealed to prevent any air leaks. Once installed, perform a thorough test to ensure proper functionality. If you encounter any issues during the installation process, feel free to ask for further assistance.

    • This reply was modified 2 years, 1 month ago by Dylan Madden.
    • This reply was modified 2 years, 1 month ago by Dylan Madden.
Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.
Scroll to Top