Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #6853
    Jason Thompson
    Participant

    Can anyone provide guidance on the installation process for the Simplex 4010-9819?

    #6854
    Khris James
    Moderator

    Sure! The installation process for the Simplex 4010-9819 is relatively straightforward. Start by ensuring that you have the necessary tools and components as specified in the installation manual. Begin by mounting the control panel securely on the wall at the designated location, ensuring it’s easily accessible for maintenance. Next, connect the power supply and battery backup following the wiring diagram provided. Then, wire the initiating devices such as smoke detectors, heat detectors, and manual pull stations to the appropriate zones on the panel. Finally, program the system according to the building layout and requirements, testing each device to ensure proper functionality. Remember to comply with all local fire codes and regulations throughout the installation process.

Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.
Scroll to Top