At firealarm.com, we recommend following these steps for replacing the PID-SS with the Gamewell-FCI AMM-2F:
Preparation: Ensure power to the system is off and the area around the module is clear.
Documentation: Take note of the wiring connections and the module’s address for proper reinstallation.
Removal: Disconnect the wires from the PID-SS module, and carefully remove it from the base.
Installation: Insert the Gamewell-FCI AMM-2F module into the base, ensuring it aligns correctly.
Wiring: Reconnect the wires to the corresponding terminals on the new module, referring to your documentation.
Testing: Power on the system and conduct thorough testing to ensure the new module functions correctly.
Addressing: If necessary, program the new module with the correct address to integrate it into the system.
By following these steps, you should successfully replace the PID-SS with the Gamewell-FCI AMM-2F. If you encounter any issues or have further questions, don’t hesitate to reach out to our support team for assistance.