  • #6443
    Ethan Walker
    Participant

    Hey everyone! I’m installing a Potter PAD100-DIM for the first time in our building, and I’m a bit confused about the wiring. Can someone guide me through the installation process?

    #6444
    Khris James
    Moderator

    Hi Ethan, no worries! For the Potter PAD100-DIM installation, start by turning off power to the circuit. Connect the wires according to the manufacturer’s instructions – typically, you’ll have line, load, and ground. Ensure a secure connection and then restore power. Remember to program the device if necessary, following the provided guidelines. If you encounter any specific issues or need further clarification, feel free to ask!