Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #5813
    Daniel Lee
    Participant

    Hey folks, I recently acquired a Fire-Lite ACC-MCB and I’m unsure about the installation process. Can someone guide me through it? I recently acquired a Fire-Lite ACC-MCB and I’m unsure about the installation process. Can someone guide me through it?

    • This topic was modified 11 months, 3 weeks ago by Dylan Madden.
    • This topic was modified 11 months, 3 weeks ago by Dylan Madden.
    #5814
    Dylan Madden
    Keymaster

    Hey Daneil, great choice with the Fire-Lite ACC-MCB. The installation process for the Fire-Lite ACC-MCB board replacement is relatively straightforward. First, ensure that all power to the panel is turned off before beginning any work. Then, carefully remove the existing control board from the enclosure, taking note of the connections to various terminals. Next, insert the new ACC-MCB board into the same location, making sure it’s securely seated and aligned correctly. Reconnect all wires and terminals according to the documentation provided with the replacement board, double-checking for accuracy. Once everything is connected, restore power to the panel and test to ensure proper functionality. If you encounter any issues or have further questions, feel free to ask!

    • This reply was modified 11 months, 3 weeks ago by Dylan Madden.
Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.
Scroll to Top