Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #6951
    Caleb Turner
    Participant

    I recently purchased a Gent M1A-R470FG-G017-01 for installation in my building. Can someone provide guidance on the proper installation procedure?

    #6952
    Khris James
    Moderator

    Sure! When installing the Gent M1A-R470FG-G017-01 call point, ensure it is mounted at a height of approximately 1.4 to 1.7 meters above the floor level and in a location easily accessible during emergencies. Connect the call point to the fire alarm control panel using appropriate wiring, following the manufacturer’s instructions and local regulations. Test the call point after installation to ensure it operates correctly. If you have any further questions or need assistance, feel free to ask!

Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.
Scroll to Top